Home  

Asbestos Removal & Enabling Works

Honeywood Contracts have completed contracts to a high standard across all sectors, with works that include:

  • Removal of asbestos from the Spanish Prince, a ship salvaged from the English Channel at Dover.

  • Asbestos removal, under fully & locally controlled conditions in shops, offices, schools & hospitals.

  • Internal Soft Strip / Demolition.

  • Shop Frontage; removal of asbestos located in the canopies with the construction of safety hoarding.

  • Lift & Escalator removal that included the fire retardant asbestos boards located within the lift shafts and underside of escalators.

Works also include removal of non-notifiable asbestos products such as asbestos vinyl floor coverings, asbestos wall panels and ceiling tiles.

Honeywood takes a responsible approach to environmental waste. To enable this process all waste material will be segregated and removed from site in allocated waste containers with a high percentage being removed for recycling.

Honeywood Contracts have an established supply chain that includes an asbestos licensed scaffolding company, asbestos trained electricians, supply air monitoring and surveys.

Ian Grostate has recently joined the Asbestos Division in the role of Asbestos Operations Manager and can be contacted via email on the contact us page to discuss, in detail, your specific requirements.

 

Asbestos
Refurbishment
Environmental
Equal opportunities
Health and Safety
Case studies
Gallery
Contact us
Documents
Useful links